Skip to content
GPUpartner

gpupartner.com — Shipping & lead times

Shipping, lead times, and white-glove delivery.

Workstations ship freight. Racks ship white-glove with on-site integration. Current-gen GPU silicon (H200 / B200 / GB200 / MI300X) is supply-constrained and lead times move month-to-month, we'll be straight about timing when you ask.

What to expect:

  • Workstations, standard freight, typical delivery 1–3 weeks once built.
  • Rack systems, white-glove freight + on-site integration when needed.
  • Current-gen GPU servers, channel lead times move; we'll quote a specific window when we quote the build, and we'll tell you up front if a deposit is required.
  • Insurance and shipping carriage included in the quote unless special handling applies.

If your deployment site has loading-dock, freight elevator, or power/cooling constraints, mention them when you submit the quote , these are the questions that turn a smooth install into a three-week mess.